Customer Cases
Shenzhen Kingbo Technology Co., Ltd.
Presented by project challenges, solutions, and deliverables to facilitate feasibility assessment for similar requirements.







Industrial Control
Upgrading the production line control system for a manufacturing enterprise
- Project Challenges
- Legacy production lines feature inconsistent equipment brands and communication protocols, with control logic scattered across multiple locations. Retrofits must minimize downtime.
- Solutions
- Organize control logic by production line, standardize communication protocols while preserving existing device interfaces, implement phased migration with rollback options.
- Delivery Results
- Phased migration with centralized control logic; configure future process adjustments on the same platform.
- Project Duration
- 8 weeks
- Deliverables
- Control Panel Hardware · PLC Programming · SCADA Configuration







Medical Equipment
Smart Health and Wellness Monitoring Device
- Project Challenges
- Must meet Class II medical device design, development, and registration requirements while ensuring stability for long-term continuous data acquisition.
- Solutions
- Split input/output and verification records according to the design development workflow. Complete sensor calibration, anomaly alerting, and data retention design.
- Delivery Results
- Complete technical documentation and prototype validation for registration; enable continuous deployment in senior care settings with remote monitoring.
- Project Duration
- 12 weeks
- Deliverables
- Monitor Terminal Hardware · Firmware · Data Platform






Export
Cross-border E-commerce Smart Hardware Export Project
- Project Challenges
- Overseas clients require strict compliance with certification documents, packaging labels, and batch consistency. Delivery schedules are tied to shipping timelines.
- Solutions
- Advance certification and sample testing in parallel. Establish material batch records and shipment documentation lists, then schedule production backward from the shipping date.
- Delivery Results
- Prepare CE and FCC test documentation. After verifying shipment documents and labels by batch, deliver them.
- Project Duration
- 10 weeks
- Deliverables
- Hardware Design · Certification Documents · Bulk Delivery
Got similar needs?
Whether for industrial control, medical devices, or foreign trade export projects, we provide professional support.
Contact Us Now